Ground Level Decking

  • Groundlevel (1)
    Ground level decking in Stirling. Area dug down to accomodate patio doors. Completion time - 2 Days.
  • Groundlevel (2)
    Ground level decking in Stirling. Area dug down to accomodate patio doors. Completion time - 2 Days.
  • Groundlevel (3)
    Ground level decking in Stirling. Area dug down to accomodate patio doors. Completion time - 2 Days.
  • Groundlevel (4)
    Small Deck in Plean, corner bench added which can be moved if required for maintenance.
  • Groundlevel (5)
    Small Deck in Plean, corner bench added which can be moved if required for maintenance. Completion time - 1 Day.
  • Groundlevel (6)
    Ground level deck in Stirling. Wraparound step at front and two ramps at path for ease of access. Completion time - 2 Days.
  • Corner + Patio deck
    Decking project in Cambusbarron consisting of large corner deck with timber balustrading, rear patio deck with rope balustrade and acorn caps, side gate and double board fence. Completion time = 4 days
  • Corner + Patio deck
    Decking project in Cambusbarron consisting of large corner deck with timber balustrading, rear patio deck with rope balustrade and acorn caps, side gate and double board fence. Completion time = 4 days.
  • Corner + Patio deck
    Decking project in Cambusbarron consisting of large corner deck with timber balustrading, rear patio deck with rope balustrade and acorn caps, side gate and double board fence. Completion time = 4 days.
  • Caravan Deck
    Caravan Deck @ Trossachs Park = Compact deck, steps and skirting installed at staff caravan. Completion time = 2 days
  • Caravan Deck
    Caravan Deck @ Trossachs Park = Compact deck, steps and skirting installed at staff caravan. Completion time = 2 days
  • Caravan Deck
    Caravan Deck @ Trossachs Park = Compact deck, steps and skirting installed at staff caravan. Completion time = 2 days
  • Balustrading Added
    Balustrading added to existing timber deck in Stirling. Decking had been built by ladyís son and balustrading was to be added to finish it off. Boards were lifted where required and newel posts fixed to frame with deckrails, spindles and handrail added in usual fashion. Deck boards were then jig-sawed to slot back in to place. Completion time = 1 day
  • 2 Tier Sunburst
    Fairly large deck in Falkirk. Built over lower part of garden and in between 2 walls to create large usable space over 2 levels. Complemented with sunburst panels at one end. Completion Time = 3 days
  • 2 Tier Sunburst2
    Fairly large deck in Falkirk. Built over lower part of garden and in between 2 walls to create large usable space over 2 levels. Complemented with sunburst panels at one end. Completion Time = 3 days
  • Angled Corner
    Small deck in Dollar, built over old patio to give larger usable space in corner of garden. Balustrade built to prevent guests falling into shrubs. Completion time = 2 days
  • Bench & Bamboo
    Medium sized corner deck in Bannockburn, built over old patio and complemented with bench seat and split cane bamboo screening on existing fence. Completion time = 2.5 days
  • Bench & Bamboo2
    Medium sized corner deck in Bannockburn, built over old patio and complemented with bench seat and split cane bamboo screening on existing fence. Completion time = 2.5 days
  • Corner + Step1
    Small corner deck in Bannockburn, to give flat area in sloped garden. Completion time = 1 day
  • Corner + Step2
    Small corner deck in Bannockburn, to give flat area in sloped garden. Completion time = 1 day
  • Corner Deck
    Small circular corner deck hiding awkward slope in Menstrie. Completion time = 1 day
  • Dug In + Bench1
    Medium sized deck and balustrade in Blackford, area dug out to lower deck level, complemented with bench seat. Completion time = 3 days
  • Dug In + Bench2
    Medium sized deck and balustrade in Blackford, area dug out to lower deck level, complemented with bench seat. Completion time = 3 days
  • Dug In + Bench3
    Medium sized deck and balustrade in Blackford, area dug out to lower deck level, complemented with bench seat. Completion time = 3 days
  • Ground Level + Fence
    Ground level deck in Killearn, shaped round raised rockery and new fence added to screen trees. Completion time = 2 days - Cat not included!!
  • Hide Patio1
    Medium sized deck and balustrade in Dunipace, used to cover old patio and allow access from rear kitchen patio doors. Completion time = 2 days
  • Hide Patio2
    Medium sized deck and balustrade in Dunipace, used to cover old patio and allow access from rear kitchen patio doors. Completion time = 2 days
  • Kitchen Door
    Small deck in Kilsyth, built to extend kitchen space, accessed from rear kitchen door, upper garden or side recessed steps. Completion time = 1.5 days
  • Large BBQ Deck1
    Large party deck in Doune, built without balustrade to retain open feel of large garden. Completion Time = 2 days
  • Large BBQ Deck2
    Large party deck in Doune, built without balustrade to retain open feel of large garden. Completion Time = 2 days
  • Large BBQ Deck3
    Large party deck in Doune, built without balustrade to retain open feel of large garden. Completion Time = 2 days
  • Large BBQ Deck4
    Large party deck in Doune, built without balustrade to retain open feel of large garden. Completion Time = 2 days
  • New Doors
    Small deck and balustrade in Arberuthven, complementing new french doors from kitchen. Completion time = 1 day
  • Over Patio
    Small deck in Stirling built over existing patio which was badly broken up. Completion time = 1.5 day
  • Rope Baluster1
    Medium sized deck in Cowie. Built over low area of rear garden to provide usable space and finished with rope balustrade. Completion time = 3 days
  • Rope Baluster2
    Medium sized deck in Cowie. Built over low area of rear garden to provide usable space and finished with rope balustrade. Completion time = 3 days
  • Rope Baluster3
    Medium sized deck in Cowie. Built over low area of rear garden to provide usable space and finished with rope balustrade. Completion time = 3 days
  • Rope Baluster4
    Medium sized deck in Cowie. Built over low area of rear garden to provide usable space and finished with rope balustrade. Completion time = 3 days
  • Round Conservatory
    Fairly large deck built round new conservatory in Stirling, complemented with corner step. Completion time = 3 days
  • Round Rockery
    Small deck in Stirling, shaped round rockery and garden covered with golden gravel. Completion time = 1 day
  • Unusual Shape1
    Medium sized deck in Cambusbarron, area was dug out and lawn retained using slabs to accommodate this unusual shaped deck in rear garden. Completion time = 3 days
  • Unusual Shape2
    Medium sized deck in Cambusbarron, area was dug out and lawn retained using slabs to accommodate this unusual shaped deck in rear garden. Completion time = 3 days
 

 

Raised Level Decking

  • Raised (1)
    Extension of chalet deck to incorporate all doors. Wider platform at side. Completion time = 4 Days.
  • Raised (2)
    Extension of chalet deck to incorporate all doors. Wider platform at side. Completion time = 4 Days.
  • Raised (3)
    Framework at chalet. Built on top of concrete base using boltdowns. Completion time for full deck = 4 Days.
  • Raised (4)
    Framework at chalet. Built on top of concrete base using boltdowns. Completion time for full deck = 4 Days.
  • Raised (5)
    Framework at chalet. Built on top of concrete base using boltdowns. Completion time for full deck = 4 Days.
  • Raised (6)
    Static caravan decking. Built on padstones for possible removal at a later date should the caravan be resited. Completion time = 1.5 Days.
  • Raised (7)
    Static caravan decking. Built on padstones for possible removal at a later date should the caravan be resited. Completion time = 1.5 Days.
  • Raised (8)
    Static caravan decking. Built on padstones for possible removal at a later date should the caravan be resited. Completion time = 1.5 Days.
  • Raised (9)
    Static caravan decking. Built on padstones for possible removal at a later date should the caravan be resited. Completion time = 1.5 Days.
  • Raised (10)
    Raised decking in Bannockburn garden, gate added to restrict pet access. Completion time = 1.5 Days.
  • Raised (11)
    Raised decking in Bannockburn garden, gate added to restrict pet access. Completion time = 1.5 Days.
  • Raised (12)
    Raised deck in Balfron to extend new conservatory. Storage space underneath with access door. Completion time = 2 Days.
  • Raised (13)
    Raised deck in Balfron to extend new conservatory. Storage space underneath with access door. Completion time = 2 Days.
  • Raised (14)
    Raised split level deck in Alloa. Completion time = 3 Days.
  • Raised (15)
    Raised split level deck in Alloa. Completion time = 3 Days.
  • Raised (16)
    Strip and refit existing deck in Alloa due to planning issues. Deck reduced in size, screening added, upgraded balustrade added and access stairs to lower garden + trellis fence. Completion time = 4 Days.
  • Raised (17)
    Strip and refit existing deck in Alloa due to planning issues. Deck reduced in size, screening added, upgraded balustrade added and access stairs to lower garden + trellis fence. Completion time = 4 Days.
  • Raised (18)
    Strip and refit existing deck in Alloa due to planning issues. Deck reduced in size, screening added, upgraded balustrade added and access stairs to lower garden + trellis fence. Completion time = 4 Days.
  • Raised (19)
    Strip and refit existing deck in Alloa due to planning issues. Deck reduced in size, screening added, upgraded balustrade added and access stairs to lower garden + trellis fence. Completion time = 4 Days.
  • Raised Deck in Larbert
    Raised Deck in Larbert, built to extend patio area with full width deep step to allow access to garden. Small section of balustrade at high side. Completion time = 1 day
  • Large Raised Deck + Balustrade
    Large raised deck in Plean to cover up old patio area and steps from patio doors. Rope balustrade added on one side with steps built on two sides and access to rear garden via stone steps. 1.8m dividing fence was also built. Completion time = 4 days
  • Large Raised Deck + Balustrade
    Large raised deck in Plean to cover up old patio area and steps from patio doors. Rope balustrade added on one side with steps built on two sides and access to rear garden via stone steps. 1.8m dividing fence was also built. Completion time = 4 days
  • Back Door Slope1
    Medium sized raised deck in Blackford, built to transform unusable sloped area into breakfasting deck. Accessed from path, kitchen door or garden stairs. Sunburst panels used to liven up balustrade and new fence built down both sides of garden for privacy. Completion time = 4 days
  • Back Door Slope2
    Medium sized raised deck in Blackford, built to transform unusable sloped area into breakfasting deck. Accessed from path, kitchen door or garden stairs. Sunburst panels used to liven up balustrade and new fence built down both sides of garden for privacy. Completion time = 4 days
  • Back Door Slope3
    Medium sized raised deck in Blackford, built to transform unusable sloped area into breakfasting deck. Accessed from path, kitchen door or garden stairs. Sunburst panels used to liven up balustrade and new fence built down both sides of garden for privacy. Completion time = 4 days
  • Back Door Slope4
    Medium sized raised deck in Blackford, built to transform unusable sloped area into breakfasting deck. Accessed from path, kitchen door or garden stairs. Sunburst panels used to liven up balustrade and new fence built down both sides of garden for privacy. Completion time = 4 days
  • Conservatory1
    Medium sized, 2 tier deck in Kippen, built to extend living area of conservatory. Gate and balustrade constructed to keep dogs and kids inside. Completion time = 2 days
  • Consevatory2
    Medium sized, 2 tier deck in Kippen, built to extend living area of conservatory. Gate and balustrade constructed to keep dogs and kids inside. Completion time = 2 days
  • Extend Patio1
    Large raised deck, new build property in Falkirk. Built to extend patio area with 45 degree angles to give it a bit of shape. Unfortunately showed how uneven the builders slab laying was. Completion time = 3 days
  • Extend Patio2
    Large raised deck, new build property in Falkirk. Built to extend patio area with 45 degree angles to give it a bit of shape. Unfortunately showed how uneven the builders slab laying was. Completion time = 3 days
  • High Doors1
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • High Doors2
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • High Doors3
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • High Doors4
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • High Doors5
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • High Doors6
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • High Doors7
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • High Doors8
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • High Doors9
    Fairly large raised deck built after new french doors installed in Bridge of Allan. Good use of wasted space in corner of building which extends living room. Gate underneath for storage. Completion time = 4 days
  • Kitchen Dining1
    Large deck over old patio in Dunblane. Used as extension of kitchen living space. Completion time = 3 days
  • Kitchen Dining2
    Large deck over old patio in Dunblane. Used as extension of kitchen living space. Completion time = 3 days
  • Long & Narrow1
    Large deck spanning full length of house in Bridge of Allan. Built to complement new french doors in living room. 1 wide and 1 narrow staircase built at each end to access garden from both sides. Completion time = 4 days
  • Long & Narrow2
    Large deck spanning full length of house in Bridge of Allan. Built to complement new french doors in living room. 1 wide and 1 narrow staircase built at each end to access garden from both sides. Completion time = 4 days
  • New Build French Doors
    Small deck at new build house in Menstrie, covering steps for french doors and creating usable space. Completion time = 2 days
  • Raised Conservatory
    Large deck wrapped around conservatory in Bannockburn, to provide area for entertaining in sloped garden. Staircase to access lower garden, sides left open for storage. Scrap timber left at customerís request for chiminea food. Completion Time = 4 days
  • Raised Summer House1
    Large raised deck built in steeply sloped garden in Alloa. Built around new summer house with individual steps and bench seat. Completion time = 4 days
  • Raised Summer House2
    Large raised deck built in steeply sloped garden in Alloa. Built around new summer house with individual steps and bench seat. Completion time = 4 days
  • Raised Summer House3
    Large raised deck built in steeply sloped garden in Alloa. Built around new summer house with individual steps and bench seat. Completion time = 4 days
  • Raised Summer House4
    Large raised deck built in steeply sloped garden in Alloa. Built around new summer house with individual steps and bench seat. Completion time = 4 days
  • Raised Summer House5
    Large raised deck built in steeply sloped garden in Alloa. Built around new summer house with individual steps and bench seat. Completion time = 4 days