Customer Testimonial

Davie and his team recently replaced a dilapidated fence with a new one. They also demolished and removed an old shed and arranged for its replacement the same (very wet) day. Despite the weather they worked with a will and we are delighted with the results. We can recommend DM Decking and Fencing without hesitation.
View More »

Peter and Hilary Meech
Bridge of Allan.

Fencing, Gates & Stuff Gallery

  • Gatesetc (1)
    Gate between house and garage in Falkirk. Overlapped for privacy. Completion time = 0.5 Days.
  • Gatesetc (2)
    Gate between house and garage in Falkirk. Overlapped for privacy. Completion time = 0.5 Days.
  • Gatesetc (3)
    1.8m high stock fence in Gartmore to contain owners dogs with access gate. Completion time = 2 Days.
  • Gatesetc (4)
    Frame up for 1.8m garden fence in Dunblane.
  • Gatesetc (5)
    Aviary built as extension to owners shed in Airth. Heavy duty clear roof and large viewing area at front. Completion time = 2 Days.
  • Gatesetc (6)
    Aviary built as extension to owners shed in Airth. Heavy duty clear roof and large viewing area at front. Completion time = 2 Days.
  • Gatesetc (7)
    Large 10' x 8' shed in Dunblane.
  • Gatesetc (8)
    Large 10' x 8' shed in Dunblane.
  • Gatesetc (9)
    Large 10' x 8' shed in Dunblane.
  • Gatesetc (10)
    Large 10' x 8' shed in Dunblane.
  • Gatesetc (11)
    Timber fence with trellis on top. Completion time = 1 Day.
  • Gatesetc (12)
    Gates with metal frame made to replace worn doors on car port.
  • Gatesetc (13)
    Frame for caravan port, tool store and log store. 6" posts for extra strength. Awaiting roof and walls. Time so far = 2 Days.
  • Gatesetc (14)
    Frame for caravan port, tool store and log store. 6" posts for extra strength. Awaiting roof and walls. Time so far = 2 Days.
  • Gatesetc (15)
    Long split height hit and miss fence in Killearn. Completion time = 1 Day.
  • Gatesetc (16)
    Long split height hit and miss fence in Killearn. Completion time = 1 Day.
  • Gatesetc (17)
    Log store in Balfron. 1.8m x 3.6m with door and felted roof. Completion time = 1 Day.
  • Gatesetc (18)
    Log store in Balfron. 1.8m x 3.6m with door and felted roof. Completion time = 1 Day.
  • Gatesetc (19)
    Large garden fence in Falkirk, 0.9m high. Completion time = 2 Days.
  • Gatesetc (20)
    Large garden fence in Falkirk, 0.9m high. Completion time = 2 Days.
  • Gatesetc (27)
    Large garden fence in Falkirk, 0.9m high. Completion time = 2 Days.
  • Gatesetc (28)
    Large garden fence in Falkirk, 0.9m high. Completion time = 2 Days.
  • Gatesetc (21)
    Heavy duty workbench in greenhouse.
  • Gatesetc (22)
    Bespoke trellis and archways in Dunblane.
  • Gatesetc (23)
    Bespoke trellis and archways in Dunblane.
  • Gatesetc (24)
    New garden fence to extend land in Stirling.
  • Gatesetc (25)
    Pergola in Gargunnock built on top of existing patio.
  • Gatesetc (26)
    Pergola in Gargunnock built on top of existing patio.
  • Gatesetc (29)
    Pergola and trellis in Stirling built to owners design.
  • Gatesetc (30)
    Pergola and trellis in Stirling built to owners design.
  • Fence + Safety Balustrade
    Fence and safety balustrade built in raised garden in Banff. Completion time = 2 days
  • Fence + Safety Balustrade
    Fence and safety balustrade built in raised garden in Banff. Completion time = 2 days
  • Fence + Safety Balustrade
    Fence and safety balustrade built in raised garden in Banff. Completion time = 2 days
  • Replacement Fence
    New fence to replace old panels in Bearsden. New fence consists of 1.5m high over patio, stepping down to 1.8m at wall. 100mm boards staggered on both sides with 38mm gap to give privacy and a finished look on both sides. Completion time = 1 day
  • Replacement Fence
    New fence to replace old panels in Bearsden. New fence consists of 1.5m high over patio, stepping down to 1.8m at wall. 100mm boards staggered on both sides with 38mm gap to give privacy and a finished look on both sides. Completion time = 1 day
  • Replacement Fence
    New fence to replace old panels in Bearsden. New fence consists of 1.5m high over patio, stepping down to 1.8m at wall. 100mm boards staggered on both sides with 38mm gap to give privacy and a finished look on both sides. Completion time = 1 day
  • Side Gate + fence
    Side Gate and Double board fence done in conjunction with decking project in Cambusbarron ( See our Decking Gallery for more photos )
  • Side Gate + fence
    Side Gate and Double board fence done in conjunction with decking project in Cambusbarron ( See our Decking Gallery for more photos )
  • 1.8 m Garden dividing fence
    1.8m garden dividing fence in Kenningknowes Road, Stirling. Old fence removed and new fence erected consisting of 150mm vertical boards, 25mm gap. Completion Time = 1 day
  • 1.8 m Garden dividing fence
    1.8m garden dividing fence in Kenningknowes Road, Stirling. Old fence removed and new fence erected consisting of 150mm vertical boards, 25mm gap. Completion Time = 1 day
  • Side Gate
    Side gate in Alloa to separate rear garden from front and stop kids from wandering. Completion time = 4 hours
  • Side Gate
    Side gate in Alloa to separate rear garden from front and stop kids from wandering. Completion time = 4 hours
  • Logstore
    Compact Log Store in Alloa – built to owner’s sizes to store hardwood logs for his new log burning stove. Pallets added as a cost free flooring option to keep logs off ground. Completion time = 1 day
  • 1.8 m Fence
    1.8m high fence in Tillycoultry. Owner removed trees and fence was built to run from existing fence to top of garden. Style of fence is 150mm vertical boards overlapping by 50mm, similar to feather edge design. Completion time = 1 day
  • 1.8 m Fence
    1.8m high fence in Tillycoultry. Owner removed trees and fence was built to run from existing fence to top of garden. Style of fence is 150mm vertical boards overlapping by 50mm, similar to feather edge design. Completion time = 1 day
  • Car Port
    Car port in Stirling = Conversion of timber garage into large enclosed car port to accommodate a larger vehicle. Old roof and internal wall were removed and new stronger roof constructed to cover area from house to communal path without requirement for centre supports for maximum space. Clear super heavyweight PVC corrugated sheets were added to roof frame and new fencing added to front. Completion Time = 2 days
  • Car Port
    Car port in Stirling = Conversion of timber garage into large enclosed car port to accommodate a larger vehicle. Old roof and internal wall were removed and new stronger roof constructed to cover area from house to communal path without requirement for centre supports for maximum space. Clear super heavyweight PVC corrugated sheets were added to roof frame and new fencing added to front. Completion Time = 2 days
  • Car Port
    Car port in Stirling = Conversion of timber garage into large enclosed car port to accommodate a larger vehicle. Old roof and internal wall were removed and new stronger roof constructed to cover area from house to communal path without requirement for centre supports for maximum space. Clear super heavyweight PVC corrugated sheets were added to roof frame and new fencing added to front. Completion Time = 2 days
  • 1.8m Gate
    1.8m garden gate contructed on site in Doune using round top boards to match new fence. Completion time = 2 days (fence & gate)
  • 1.8m Round Top Vertical 5
    1.8m round top vertical fence in Bridge of Allan, replacement for old fence adjacent to road. Completion time = 2 days
  • 1.8m Round Top Vertical
    1.8m round top vertical fence in Doune, constructed to enclose large garden. Completion time = 2 days
  • 1.8m Round Top Vertical2
    1.8m round top vertical fence in Doune, constructed to enclose large garden. Completion time = 2 days
  • 1.8m Round Top Vertical3
    1.8m round top vertical fence in Doune, constructed to enclose large garden. Completion time = 2 days
  • 1.8m Round Top Vertical4
    1.8m round top vertical fence in Doune, constructed to enclose large garden. Completion time = 2 days
  • 1.8m Round Top Vertical6
    1.8m round top vertical fence in Bridge of Allan, replacement for old fence adjacent to road. Completion time = 2 days
  • 1m Flat Top
    1m flat top vertical fence in Fintry, all around large garden. Completion time = 2 days
  • 1m Flat Top2
    1m flat top vertical fence in Fintry, all around large garden. Completion time = 2 days
  • 1m Flat Top3
    1m flat top vertical fence in Fintry, all around large garden. Completion time = 2 days
  • 1m Gate
    1m garden gate, constructed on site in Balfron using round top boards to match new fence. Completion time = 1 day (gate & fence)
  • Bamboo Screen
    1.5m split cane bamboo screening in Stirling, used to screen unsightly wall next to decked area. Completion time = 0.5 day
  • Bow Trellis Top
    1.8m vertical hit & miss fence + 450mm bow top trellis in Bridge of Allan, requested for privacy and extra height due to window heights. Completion time = 2 days
  • Bow Trellis Top2
    1.8m vertical hit & miss fence + 450mm bow top trellis in Bridge of Allan, requested for privacy and extra height due to window heights. Completion time = 2 days
  • Build Up Fence1
    New build house in Dunipace. Builders handed house over with corner of garden dropping almost 1.2m in height with original fence following ground level! Fence was stripped where required and new fence extended in height to allow for future deck to be built and retain privacy all round. Completion time = 2 days (full garden)
  • Build Up Fence2
    New build house in Dunipace. Builders handed house over with corner of garden dropping almost 1.2m in height with original fence following ground level! Fence was stripped where required and new fence extended in height to allow for future deck to be built and retain privacy all round. Completion time = 2 days (full garden)
  • Build Up Fence3
    New build house in Dunipace. Builders handed house over with corner of garden dropping almost 1.2m in height with original fence following ground level! Fence was stripped where required and new fence extended in height to allow for future deck to be built and retain privacy all round. Completion time = 2 days (full garden)
  • Build Up Fence4
    New build house in Dunipace. Builders handed house over with corner of garden dropping almost 1.2m in height with original fence following ground level! Fence was stripped where required and new fence extended in height to allow for future deck to be built and retain privacy all round. Completion time = 2 days (full garden)
  • Build Up Fence5
  • Chevron Panels
    1.8m chevron panels in Falkirk, used to screen trees adjacent to pergola. Completion time = 2 days (pergola & fence)
  • Crescent Trellis Top
    1.5m vertical hit and miss fence + 450mm crescent top trellis in Kippen, separating adjacent gardens. Completion time = 2 days
  • Crescent Trellis Top2
    1.5m vertical hit and miss fence + 450mm crescent top trellis in Kippen, separating adjacent gardens. Completion time = 2 days
  • Flat Top Overlap
    1.8m flat top overlap fence in Stirling using 150mm board and 100mm boards. Becoming increasingly popular for privacy. Completion time = 1 day
  • Gate Metalwork1
    This is a 14”, cranked crook and band which is used (in a pair) as hinges for all our single gates. These are galvanised and heavy duty, allowing for easy adjustment of gate and gate can be removed if required. If security is an issue then top crook can be turned round to stop gate removal
  • Gate Metalwork2
    This is a 6” ring catch which allows the gate to be opened from either side. Heavy duty and galvanised in construction
  • Gate Metalwork3
    This is a 6” brenton bolt which allows the gate to be secured shut, usually from the inside. For extra security, a padlock can be added to the bolt. Heavy duty and galvanised in construction
  • Horizontal 100m Rails
    1.2m horizontal rail fence in Balfron, traditional look ranch fence adjacent to country road. Completion time = 2 days
  • Horizontal 100mm Rails2
    1.2m horizontal rail fence in Balfron, traditional look ranch fence adjacent to country road. Completion time = 2 days
  • Pergola1
    Adjustment to pergola in Stirling. Customer had patio and pergola installed by other tradesman but was unhappy with size of pergola and requested that we reduce the size for them. Structure was stripped down, new post fixed in and beams re-sized and put back together again. Completion time = 1 day
  • Pergola2
    Adjustment to pergola in Stirling. Customer had patio and pergola installed by other tradesman but was unhappy with size of pergola and requested that we reduce the size for them. Structure was stripped down, new post fixed in and beams re-sized and put back together again. Completion time = 1 day
  • Pergola3
    Pergola, slabs and fence in Braco, used to transform small rear garden. Completion time = 2 days
  • Pergola4
    Pergola, slabs and fence in Braco, used to transform small rear garden. Completion time = 2 days
  • Pergola5
    Pergola and deck in Falkirk, built in conjunction with chevron panel fence. Completion time = 2 days
  • Round Top Overlap
    1.8m round top overlap fence in Balfron, constructed for complete privacy in rear garden. Completion time = 2 days
  • Stairs1
    Staircase and balustrading in Bridge of Allan used to link decked area at rear of house to upper garden. Completion time = 2 days
  • Stairs2
    Staircase and balustrading in Bridge of Allan used to link decked area at rear of house to upper garden. Completion time = 2 days
  • Stairs3
    Staircase and balustrading in Bridge of Allan used to link decked area at rear of house to upper garden. Completion time = 2 days
  • Stairs4
    Staircase and balustrading in Bridge of Allan used to link decked area at rear of house to upper garden. Completion time = 2 days
  • Trellis Panels1
    1.8m trellis panels in Dollar, constructed to break up unsightly area on opposite side of burn. Completion time = 1 day
  • Trellis Panels2
    1.8m trellis panels in Dollar, constructed to break up unsightly area on opposite side of burn. Completion time = 1 day
  • Wall Screen 2
    2m horizontal hit & miss effect wall screen in Balfron. Timber mounted to unsightly wall in back yard to give effect of fencing all round without taking up too much space. Completion time = 2 days
  • Wall Screen1
    2m horizontal hit & miss effect wall screen in Balfron. Timber mounted to unsightly wall in back yard to give effect of fencing all round without taking up too much space. Completion time = 2 days